       |
File 111023-BW
 |
|
250-tonne Materials Handling Crane Barge
This Manitowoc M2250 is pedestal mounted on a 160’ x 60’ x 10’ flat deck barge and was manufactured in 2000.
Located in The State of Louisiana, USA
Price for Crane Barge: USD $ 3,980,000 |
Technical Details
| Principal Dimensions and Characteristics |
| |
Barge: |
| |
Type: |
Flat Deck Barge |
| |
Length Over All: |
48.77 m
|
160 feet |
| |
Beam: |
18.29 m |
60 feet |
| |
Depth: |
3.05 m
|
10 feet |
| |
Barge Deck to Waterline: |
1.62 m |
5.3 feet |
| |
Barge Deck to First Level |
2.68 m |
8.8 feet |
| |
Barge Deck to Crane Deck: |
7.65 m |
25.1 feet |
| |
Crane Deck to Boom Heel pins: |
3.08 m |
10.11 feet |
| |
Crane Deck to Op. Eye level: |
12.28 m |
40.3 feet |
| |
Crane Deck to top of Op.Cab: |
13.29 m |
43.6 feet |
| |
|
| |
Crane (powered by): |
| |
Main Engines (2): |
| |
Make/Model: |
Cummings / N14C |
| |
Power: |
391 kW x 2 |
525 hp x 2 |
| |
The engines drive the RexRoth hydraulic pumps & motors for precisely controlled lifting applications. |
| |
(Equipped with 120 ft #44 boom) With 70 ft of #44 boom it is rated at 275.6 tons @ 18 ft radius. |
| |
|
| |
The Crane has always been used for bucket work (chart attached), however it has the correct boom tip with |
| |
sheaves to be set up for heavy lift applications, as well. There is also a lift chart attached. |
| |
|
| |
In clamshell mode 3/8 inch (.015 mm) cable was used. The Crane is equipped with a hydraulic powered third drum |
| |
(1/2 inch (.020 mm) cable) which we use for a bucket power tagline, as well as a "squirrel-cage" style tagline |
| |
assembly. |
| |
|
| |
At the forward barge deck level near the boom rest there is a 20 foot (6.10 m) container supply room. The barge |
| |
deck pedestal area has a modern newly-refurbished kitchen/lunchroom area for the crew, as well as an office |
| |
for the crane manager. Forward of the crew area is several more enclosed storage/work areas, as well as room |
| |
for the two electric welding machines, 4,000 psi electric pressure washer system (hard piped all the way up to |
| |
the crane deck) and oil storage. |
| |
|
| |
Generators (2): |
| |
Power: |
160 kW x 2 |
215 hp x 2 |
| |
The two (2) generators are located on the second deck which provide power for crew quarters, lighting, and one |
| |
Clyde frame six, three drum winch and one Clyde frame seven, three drum winch. |
All details on these pages are given in good faith
and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose
is either stated or implied. Prices are subject to change without notice.
|
|
|
| DredgeBrokers © 2007 |
| Dredge Brokers Design by thewritersforhire.com |