Dredge Brokers - Used Dredgers (Dredges) For Sale

120824-DS

650 m3 Hopper Dredger

650 m3 Hopper Dredger

This 650 m3 Hopper Dredger was built in 1972 in Spain and was converted in 1996 and its Classification Society is Local Class 3T (Sea Going). Its next Dry Docking is due in June, 2016 and the next Special Survey and Annual Survey are due in March, 2017.

Flag: Spanish

Located in South Europe

Select Your Currency
Price in Seller's Preferred Currency
EUR 1,400,000
Price in Your Preferred Currency
USD 1,521,739
* Approximate; see Terms of Use

Technical Details

 
Principal Dimensions and Characteristics
  Year Built/Converted: 1972/1996
  Classification Society: Local Class 3T (Sea Going)
  Length Over All: 45 m 148 feet
  Beam: 9.80 m 32 feet
  Depth: 3.66 m 12 feet
  Draft (max): 3.30 m 11 feet
  Hopper Capacity: 650 cubic meters 850 cubic yards
  Speed: 9 knots free / 7 knots loaded
  Accommodation:
    Cabins: 1 x 2 men and 1 x 4 men
    Dining room, Kitchen, Toilet & Shower
Machinery & Propulsion
  Main Engine:
    Make/Model: Cummins / KTA38 (2007)
    Power @ 1,500 RPM: 895 kW 1,200 hp
  Generators (2):
    Make/Model: Stanford
    Power: 30 kW x 2 hp x 2
  Hydraulic Power Pack for Pumps:
    Make/Model: Cummins / KTA 19
    Power: 522 kW 700 hp
  Hydraulic Power Pack for Jet Pump:
    Make/Model: Cummins / KTA 19
    Power: 179 kW 240 hp
  It has mechanical sealing, hydraulically
  Azimuth Steering
Pump
  Power: 597 kW 800 hp
  Discharge Distance: 13.72 m 45 feet
Cargo & Other Capacities
  Fuel capacity: 36,000 liters 9,510 gallons
  Lube oil capacity: 4,000 liters 1,057 gallons
  Range at sea - Endurance: approx. 30 days
  Estimation fuel consumption (approx.): 1,500-1,800 liters/day 396-476 gallons/day
  Unload distance by pipe (max.): 1,000 m 3,281 feet
  Dredging depth: 18 m 59 feet
    Enlarging pipe (max.): 22 m 72 feet
  Loading time: 35-45 minutes
  Unloading time: 45-60 minutes - 500 m (1,640 feet) pipe
Navigation & Communication Equipment
  Sounder: AIS
  NAVTEX: Radar
  VHF(s): SART
  GPS(s)
  Bridge fully equipped in compliance with Spanish Regulations.
Other Details
  Converted into trailing suction split hopper dredger in 1996.
  Submerged load pump Warman working with hydraulic engine and discharge pump Bagema
  with hydraulic engine.
  Some spares included for Schottel, hydraulic and pumps.
  Reported to be in full operational condition.
  Spent more than 20 years trading in fresh water.
  Hull refitted in 2009 on DD.
  Over flow is hydraulic. Height can be regulated.
   
 

All details on these pages are given in good faith and are believed to be accurate but no warranty of accuracy or completeness or suitability for purpose is either stated or implied. Prices are subject to change without notice.

 
Copyright 2005